Leeds School
Operable Partition Service
The Mr Acoustic team were approached by a school based in Leeds as they were experiencing issues with the panel alignments on a large set of operable partition wall – standing at well over 2 meters.
To ensure a thorough assessment of the wall was carried out, a mobile tower unit was used to access the 4.5 meter track. The track and seals were lubricated, to ensure the panels run smoothly.




